Inner Mongolia Rural Area - Project Case (Domestic)
Project type
Inner Mongolia rural domestic sewage treatment project
Project Installation time
October, 2022
Condition of service
Winter is long and the temperature is low. The lowest temperature in winter can reach minus 30℃, and the permafrost layer can reach-2m. At the same time, due to the scattered residents and the remote project site, it is difficult for the resident professional environmental protection technical personnel to implement equipment maintenance and management.
According to the actual situation of different project points, the technical personnel suggest choosing BioFilter500-type products. BioFilter The wall thickness of the tank can reach 14mm, and the depth of soil burial is not affected.
BioFilter The system can still operate normally under the condition of extremely low temperature. In December, the temperature is about 10℃ below zero, the treatment effect of the equipment is good, and the water is clear and bright, which meets the discharge requirements. In the daily operation process, there is no electricity, no personnel maintenance, which meets the needs of customers.